Skip to main content

Jordan Chalk Manufacturing Company

A project by Green Electron in Jordan

Project Facts

Location
Al Karak
Project capacity
503.8 kWp
Project Type
Hanger rooftop
Total Energy Generated
764 megawatt-hours (MWh)
Payback Period
4 years

Green Electron Energy Solutions delivered a comprehensive solution to The Jordan Chalk Manufacturing Company encompassing the design, procurement, installation, and commissioning of a Hanger rooftop mount Solar PV system, with a capacity of 503.8 kWp, which is connected with the EDCO grid utility,

The project designed a surplus of 145% to cover the entire current and the future electricity demand of the factory buildings in Al Karak.

The payback period for this initiative is estimated to be approximately 4 years.

The operational commencement of the plant occurred in September 2023, and it is projected to generate an annual output of 764 megawatt-hours (MWh). This strategic investment proves highly viable within the particular sector, leveraging the competitive landscape of the industrial sector to reduce overhead costs and to boost overall profitability.