The Arab Potash Co.

Together with renowned partners such as ALTRAD-Cape, GBT Buecolit, HAW Linings, VDM Metals and BUTTING; International Technical Construction (ITCC) executed several plant rehabilitation and maintenance projects at the Arab Potash Company that span from critical plant equipment replacements, emergency repairs, tailor-made designs, to operation and maintenance services.

Two Crystallizers were fully replaced while One Crystallizer was repaired on-site in record time following a fire incident. Additionally, rubber lining repairs were performed in critical plant equipment.

Hot Thickener Tank Roof Panels (FRP Panels) were designed, supplied and installed on-site during a record shutdown period of 9 days.

Alloy 400 and 625 Pipes, Fittings, Plates and Pre-Fabricated Spools were supplied along with the design and supply of Six Carnallite Centrifuge Casings made from SS316L.

In addition, annual frame agreements were signed and executed for plant scaffolding and maintaining plant dedusting systems. 