The Engineering, Procurement, Construction, O&M of the 3 MWac Grid - Connected PV plant aims at covering the electrical consumption of all the Bank’s branches in the middle governorates of Jordan on a wheeling basis. The annual production is 6,650 MWhr/year in the first year.
The land area is 53,186.43 m2, and the system consists of 3 stations, of which each is 1 MWac, with a total of 50 SMA Sunny Tri Power 60-10 inverters
The project utilizes a SCADA system including full monitoring and control of the whole plant components utilizing string monitoring. The SCADA system includes weather stations with multiple sensors facilitating full monitoring of weather conditions.
The project was implemented ahead of schedule, in 180 calendar days from the initial design stage until full mechanical and electrical installation.