Project Facts
Project Type
Roof Top
Project capacity
1.1MWp
Launch Date
March 2017
Completion Date
September, 2018
Steel Structure size
3000 s.q.m.
The project comprised the joint design and construction of a new steel structure facility, sized over 3000 s.q.m. by “maani steel” which is a subsidiary of maani ventures, and the construction of a Solar PV plant of over 12,000s.q.m. of existing and new roof tops by “maani solar”.
The project entailed the challenge of utilizing different roof tops with varying tilts and azimuths that was later delivered with an optimum design to achieve the highest possible return per kWp installed.